W.J. Rapp brought in to replace broken concrete with sub slab and wear slab.

Railroad ManufacturingW.J. Rapp was brought in to remove 23,400 sq.ft of broken concrete and replace with a sub slab with a wear slab on top. The sub slab was 7” thick with a 5” wear slab work was to be performed in 15 days. This  included cure time while plant was shutdown for holiday. Work was completed ahead of schedule.

Concrete PourConcrete Slab

WJ Rapp Railroad Manufacturing Slab