A church needed a concrete parking deck repair and W.J. Rapp was part the team that provided the solution.

12. W.J. Rapp Concrete Finishing

12. W.J. Rapp Concrete Finishing

A local church had a parking deck that needed repairs. Richmond Primoid was brought in to make various structural repairs to parking deck. In addition, 6,000 sq.ft. of parking deck area had to be removed and replaced with new concrete. Expectations were high and several goals were set and then met.

  • Total project needed to be complete in 90 days.

Richmond Primoid and W.J. Rapp teamed up to meet this challenge.

  • Second Floor 6,000 sq. ft. area of concrete had to be removed and replaced.

This required the removal of all underside electrical and fire protection.

This also required design of steel support for the front wall of the existing building to support the wall and building before floor could be removed.

Entire underside of the second floor was scaffold.

The upper floor was cut into pieces that could be carried out to dumpster.

Headroom was only 7 feet tall which limited access.

  • Steel beams Removed and Replace

Upon removal of the floor, deteriorated encased steel beams had to be removed and installed where needed.

R.S. Harritan provided structural steel work to allow the concrete steel beams to be incorporated into a new structural slab.

  • New Concrete Slab

The slab was poured with a 5,000 psi mix that was reached in 7 days.

The concrete had a corrosive additive added.

  • Meet limited time frame and access demands

Due to the location of placing concrete…. trucks and a pump truck the pour had to take place on a Saturday morning at 5:30 a.m.

Upon completion of the pour and after the 7 days break shoring was remove.

Upon completion of the pour and after the 7 day break shoring was removed and restoration fo the electrical and fire Protection.

The photos below document the work at different stages of completion. This was a significant amount of concrete. Over 300 yards of concrete were removed and replaced to complete this important parking deck repair. If your parking lot needs concrete repair W.J. Rapp has the experience, the equipment and the knowledge to help you get your job done correctly.

  1. Reinforced steel in place prior to concrete placement
  2. Concrete pumper is used to pump the concrete
  3. Concrete air-entraining test
  4. W.J. Rapp set up with their own dumpster to contain the clean-out concrete debris
  5. Concrete truck discharges load into the concrete pumper
  6. Concrete taken from the first truck to be tested
  7. Photo shows the team of W.J. Rapp team performing the placement of the concrete.
  8. Concrete as it comes off the truck.
  9. On-site testing agent making cylinders for testing the compression strength of the concrete.
  10. W.J. Rapp worker adjusting the slab reinforcing
  11. W.J. Rapp finishing the concrete
  12. More finishing

So if you have a concrete parking lot that needs repair or any other commercial concrete work give W.J. Rapp a call. They are known all over Richmond, Virginia for their quality work and extensive equipment capabilities.

1-Reinforced Steel for Concrete Floor

1-Reinforced Steel for Concrete Floor

2-Concrete Pump 64

2-Concrete Pump

3-Concrete air-entraining test

3-Concrete air-entraining test

4-W.J.Rapp Dumpster for Concrete Debris

4-W.J. Rapp Dumpster for Concrete Debris


5- Concrete tuck Discharges load into the concrete pumper

5- Concrete truck Discharges load into the concrete pumper

6-Concrete is sent off for testing

6- Concrete is sent off for testing

7-Concrete Placement by the W. J. Rapp team

7- Concrete Placement by the W. J. Rapp team

8- Concrete Coming off the truck

8- Concrete Coming off the truck

9-Owners on site testing agent testing concrete

9-Owners on site testing agent testing concrete

10. Adjusting the Slab Reinforcing of the concrete

10. Adjusting the slab reinforcing of the concrete

11. Concrete Finishing

11. Concrete Finishing

12. W.J. Rapp Concrete Finishing

12. W.J. Rapp Concrete Finishing

W.J. Rapp keeps up on the latest equipment in the construction industry.

Training on New EquipmentAnyone who has ever tried to perform a construction job knows that the right equipment and tools are a key component of success. W. J. Rapp constantly upgrades equipment and training for their employees. Often manufacturers come in and demonstrate their equipment to our construction team. On this day, Hilti brought in new equipment that helps solve dust issues on the job. Hilti is manufacturer of tools that help make jobs faster, safer and more productive. They make terrific construction equipment tools known for their performance. W. J. Rapp believes that the proper tools translate into jobs that are performed on time, on budget and of the highest quality. On this day, dust management was the focus of the training. Vacuum cleaners to help make your job a dust-less environment were featured. In addition, dust management systems for saws and other tools were demonstrated.

Afterwards everyone enjoyed a lunch and we were filled with knowledge of the latest equipment from Hilti. This investment in training for our people continues to reap benefits for our clients. So the next time you have a concrete construction job give us a call. You will have highly trained people who are equipped properly to perform your job as requested.

Bridge Manufacturer – Pit Construction, Sandblasting Pit

W.J. Rapp, working with a bridge manufacturer, was able to install new sandblasting pit system that allowed the new bridge sections to ride through a structure that sandblasted the new steel in one automated path. Before the bridge sections were done in smaller pieces and by hand.