Portable Bridge Installation

This old bridge needed replacement.

Slide2

 

W.J. Rapp Co. Inc. was asked to reposition the bridge, and stabize it using oak timbers. They also built crushed-rock entrance and exit ramps to the bridge.

 

Slide5

 

 

Slide6 Slide7

 

Crushed rock was used by W.J. Rapp to build entrance and exit ramps to the portable bridge. The steel ramp structures were left in place to help stabilize the crushed rock for heavy truck traffic.